Explosive Depot (Sasol Roche)

Oldknow Earthmoving and Haulage (OEH) carried out work on this project including reconstruction of existing bund walls, construction of batters, drainage redesign, construction of containment ponds and improvements to road and storage pad areas. Material had to be sourced from offsite areas and hauled in by road trucks, concrete works included erosion prevention in drains and construction of two concrete drive in sumps and areas were then graded. There was also a bunded area tripled in size. There was an estimated 1500 bcm’s of soil moved from areas on site to construct the extra bunding as well as access road reconstruction and drainage improvements.